Bathroom remodeling Rose District, OK

Century-old brick on Main. Bathrooms built for now.

The Rose District's storefronts went up in brick from 1904, and the typical house on the streets around them is nearly thirty years older than the city's. We remodel both: primary baths and safer showers in downtown homes, and restrooms that meet the ADA for the restaurants, shops and offices on Main Street.

  • Free estimate at your house or your shop
  • Every cost itemized on paper, in a day or two
  • Restroom work planned around your hours
  • ADA-mindedMeasured to the 2010 Standards
  • WaterproofedEvery wet wall and floor
  • Written warranty1 year on our workmanship
Primary bathroom with a white shaker vanity, a marble top, an arched gold mirror between two sconces and a blue mosaic tile floor

Josh was very prompt and easy to work with!

Sarah G.Rated 5 out of 5, Google review
  • 7+Years in business
  • 4.931+ Google reviews
  • Free estimates
  • Homes and businesses
  • Waterproofing on every wet area
  • Written 1-year warranty
  • We answer 8 AM to 8 PM
  • Bathrooms only
  • Registered federal vendor
  • Locally owned in Tulsa

Rose District bathroom contractors

Customers on the record, the owner on the job

Two customers on video, three Google reviews copied without edits, and a word from the owner about how he works in older buildings.

I donโ€™t think you could find anybody any better to work with than these people.The homeowners, in their video review
Jeremy Fuller, owner of Oklahoma Bath Professionals in Tulsa, with his family
Family owned, based in Tulsa Jeremy Fuller Managing Director, Oklahoma Bath Professionals

Jeremy started learning tile and showers at 16, and he still picks up the phone himself. In an older building he tells you which walls he would open, which he would leave alone, and why.

About Jeremy

Great service, they remodeled my bathroom and the job was excellent. The team was very professional and detailed. Definitely pros in the bathroom remodeling business

Evan R.Google review, rated 5 out of 5

100% would recommend for sure!!

Matthew D.Google review, rated 5 out of 5

Great company! Got my project done fast and extremely happy how it turned out.

Michael L.Google review, rated 5 out of 5
4.9 31+ Google reviews, rated 4.9 out of 5 Read every review

Rose District commercial restrooms

A house a few blocks off Main, or a business on it

Homeowners near downtown call us for primary baths and safer showers. Owners and managers of the restaurants, shops and offices on Main call us for restrooms every customer can use.

Bathroom renovation, Rose District

Old brick, older houses, new neighbors

Downtown Broken Arrow is a different place from the subdivisions around it. The storefronts are more than a century old, the houses beside them are older than most in the city, and new homes are filling the gaps. Below, the public record, and what each piece of it means once a bathroom or restroom is opened up.

Downtown Broken Arrow, on the record

1904Source 1
Brick begins replacing the frame stores on Main 124 South Main went up in brick between 1904 and 1907; 121 South Main followed in 1910, 201 South Main in 1918.
1909Source 1
Residents vote for a water system An 8-inch line from City Springs to a tower near Main and Commercial, five years after the first brick storefronts.
1966Source 2
Median year built for homes around Main Census tract 74.02, which takes in the Rose District. For Broken Arrow as a whole: 1994.
4 in 10Source 2
of those homes were built before 1960 About 620 of 1,420 (a survey estimate with a wide margin), the 1950s the busiest decade. Citywide, fewer than 1 in 12.

What that means for a bathroom or a restroom

  1. Restrooms fitted into century-old storefronts

    The oldest brick on Main was standing before the town voted for its water line, so plumbing came to those buildings later and took whatever room was left. That is why a downtown restroom's door, toilet drain and grab bar wall are so often in the wrong place for the 2010 ADA Standards. We measure those three before we draw anything, and the guide on this page goes through each one.Source 1

  2. A public restroom behind every counter

    The district has more than 50 places to eat, shop and explore. A business open to the public must remove restroom barriers whenever that is readily achievable, remodel or no remodel: a grab bar, a lever handle, a lower mirror, insulation on the sink pipes. Those small fixes are where most Main Street restroom work starts, and each one gets its own line on our quote.Source 3

  3. Houses older than the rest of the city

    Around Main the typical house is from the mid-1960s, while about three in four Broken Arrow homes were built in 1980 or later. A house this age can still have galvanized supply lines, a cast iron drain or a floor that has sagged around the old tub. We open the wall, show you what is there, and you sign any change to the price before the work is done.Source 2

  4. A revival with a plan behind it

    The city adopted its downtown master plan in 2005, cut Main Street from four lanes to three for wider sidewalks, and added a downtown residential overlay to its zoning at the end of 2017. A four-story building with apartments over shops broke ground on the north end in 2018. Newer bathrooms like those rarely need tearing out; what they may need is a seat, grab bars or a step-free shower, in finishes that match.Source 4

  5. Bathrooms stacked over someone else

    New downtown homes stack people: apartments over storefronts, and two-story row homes such as the six that broke ground at East Elgin and East 1st in 2021, each with two and a half baths. A slow leak in an upstairs shower ends up in a neighbor's ceiling or on a shop's stock. Every shower we build sits on a waterproofing membrane that covers the whole wet floor, never just the pan.Source 5

Plan view of a single-user ADA restroom with a 32-inch clear door, a 60-inch turning circle, the 60 by 56 inch clear floor at the toilet, the toilet centerline 16 to 18 inches from the side wall, both grab bars and the sink's clear floor space
A single-user restroom laid out to the 2010 ADA Standards (sections 304, 404, 603, 604, 606 and 609): the dimensions we check first in an older Main Street building.
Sources (9)
  1. Museum Broken Arrow (Mickel Yantz), "Broken Arrow - Then and Now" walking tour on Clio, 2025: building dates for 121, 124 and 201 South Main and the 1909 water system vote
  2. U.S. Census Bureau, American Community Survey 2024 5-year estimates (2020 to 2024) for Census tract 74.02 and the City of Broken Arrow, tables B25034 (year built) and B25035 (median year built), via Census Reporter; tract confirmed for 100 North to 500 South Main with the Census Geocoder
  3. TravelOK (Oklahoma Tourism and Recreation Department), Rose District listing
  4. The Municipal, "Rose District sparks rejuvenation in downtown Broken Arrow," January 2020
  5. KTUL, "New housing development coming to Broken Arrow's Rose District," August 17, 2021
  6. U.S. Access Board, 2010 ADA Standards for Accessible Design, with 28 CFR 35.151 (state and local governments)
  7. 28 CFR 36.403, alterations and the path of travel (20% rule), Legal Information Institute
  8. 28 CFR 36.304, removal of barriers and the 1991 Standards safe harbor, Legal Information Institute
  9. ADA.gov, tax incentives for businesses (Disabled Access Credit and the barrier removal deduction)

Master bathroom remodel Rose District

Which kind of downtown home do you have?

The houses near Main were built a lifetime apart, and each age starts a remodel in a different place. Pick yours.

Clawfoot soaking tub under a wide window, with white wainscot walls and a wood floor

Built before 1940

A primary bath that suits the house's age

A bathroom this old may have been redone several times, each layer over the last. We take it back to the framing, bring the plumbing up to current code while it is open, and build a primary bath that belongs in the house, with a membrane behind every tile.

  • Plumbing updated to code with the walls open
  • Tile chosen for the house's era
  • Floor framing checked under a heavy tub

ADA commercial restroom Rose District

One restroom, one owner: what the ADA asks of yours

For the owner or manager of a Main Street restaurant, shop or office with a single-user restroom: what the 2010 ADA Standards require of that room, in the order we check it, and when the law actually requires the work. A plain-language guide, not legal advice.

Small single-user restroom with sage green paneled walls, a wall-hung toilet and a wall-hung sink

Start at the door, the wall you least want to move

In an older building, moving a restroom door can mean moving a wall the floor plan depends on, so we measure the door before anything else. Section 404 of the Standards sets the door itself; section 603 sets how it may swing. All our business restroom services.

32 inches clear (404.2.3)
Measured with the door open 90 degrees, from the face of the door to the stop. A door sold as 32 inches gives less once its own thickness and the stop are counted, so we measure the opening, not the slab.
Hardware a closed hand can work (404.2.7)
A lever or a pull 34 to 48 inches off the floor, with no tight grip or twist; a round knob fails. An interior door must open with 5 pounds of force or less (404.2.9), which often means adjusting the closer.
Which way it swings (603.2.3)
The door may swing into the turning circle, not over the clear floor at the toilet or sink, unless the room is single-user and a 30 by 48 inch space stays clear past the swing. Rehanging it to swing out, where the hall allows, often fixes this without moving a fixture.
Room beside the latch (404.2.4)
On the pull side, a door approached head-on needs 18 inches of clear wall past the latch. A restroom door jammed into a corner fails this even when the room behind it is fine.
Wall-hung commercial toilet with an open-front seat and a stainless grab bar on the wall behind it

The toilet corner: 60 by 56 inches nothing else may enter

The toilet needs a wall behind it and a wall beside it for the grab bars, and a block of floor in front of it that no other fixture may sit in (604.3).

Centerline 16 to 18 inches off the side wall (604.2)
If the old drain sits at 14 or 20 inches, the flange has to move, which means opening the floor. That shows up on the quote as its own line, never as a surprise.
60 by 56 inches of clear floor (604.3.1)
Sixty inches from the side wall, 56 from the back wall. In a business restroom the sink may not sit inside that block; only homes get that exception.
A seat 17 to 19 inches high (604.4)
Measured to the top of the seat, which takes a taller bowl than a standard one. The flush handle goes on the open side, away from the wall (604.6).
Two grab bars that hold 250 pounds (604.5, 609)
A side bar at least 42 inches long, starting no more than 12 inches from the back wall and reaching 54 inches out; a rear bar at least 36 inches, running 12 inches to one side of the toilet's centerline and 24 to the other; both 33 to 36 inches high. In an old wall that strength comes from blocking or a backing plate we add, never from plaster or tile.
Paper within reach (604.7)
The dispenser 7 to 9 inches in front of the bowl, its outlet 15 to 48 inches off the floor, and never tucked behind a grab bar.
Two wall-hung restroom sinks with sensor faucets and open space underneath, against a dark tile wall

Sink, mirror and sign: details customers notice

Smaller items, but each one has a number in the Standards, and each costs little to get right while the walls are open.

A rim no higher than 34 inches (606.3)
With knee room underneath: 27 inches high and 30 inches wide (306.3). A vanity cabinet blocks that, so a business restroom gets a wall-hung sink or an open counter.
Pipes covered (606.5)
The drain and supply lines under the sink are insulated or boxed in, so a seated person's knees never touch a hot pipe or a sharp edge.
Mirror starting at 40 inches or lower (603.3)
Over the sink, the glass begins no higher than 40 inches off the floor. A mirror elsewhere in the room starts no higher than 35.
A sign beside the latch (703.4, 216.8)
Raised letters and Braille, 48 to 60 inches up, on the wall at the latch side. If your other restrooms do not comply, the one that does carries the wheelchair symbol and the others point to it.

When the law reaches your restroom, and when it does not

Remodeling the restroom means everything you change must comply. Remodeling a different room can pull the restroom in too, which surprises most owners. How we handle ADA restroom compliance.

No remodel planned (28 CFR 36.304)
A business open to the public must remove barriers where that is readily achievable, meaning easy and not costly. The rule's own examples include grab bars, a raised toilet seat, insulated sink pipes and a moved towel dispenser.
Only the restroom is remodeled (36.402)
Every element you alter must meet the 2010 Standards. Elements you leave untouched that met the 1991 Standards can stay as they are (the safe harbor in 36.304(d)(2)).
The dining room or sales floor is remodeled (36.403)
Restrooms are not a primary function area, but the rooms where you serve customers or do your work are. Alter one, and the path of travel to it, including the restrooms that serve it, must be made accessible, up to 20% of what the main alteration costs. A $50,000 dining room job can carry up to $10,000 of that work. City and county buildings follow the same rule under 28 CFR 35.151(b)(4).
Where that 20% goes first (36.403(g))
An accessible entrance, then the route to the altered area, then at least one accessible restroom for each sex or a single unisex one. In many small Main Street buildings, that single-user room is the realistic answer.
Tax help for small businesses
A business with 30 or fewer employees or $1 million or less in revenue may claim the Disabled Access Credit: half of eligible costs between $250 and $10,250, up to $5,000 a year (IRS Form 8826). Ask your accountant; we itemize the barrier removal so they can.
Three Main Street situations, and what each one asks of the restroom
Nothing is being remodeledOnly the restroom is remodeledThe dining room or sales floor is remodeled
What must complyBarriers that are readily achievable to removeEvery element you alterThe altered area and the path of travel to it
The restroomFix what is easy now: bars, pipes, mirror, hardwareBuilt to the 2010 Standards wherever it is touchedBrought into the job, up to 20% of the main cost
The federal rule28 CFR 36.30428 CFR 36.40228 CFR 36.403
Where we startA priced list of quick fixesThe door and the toilet cornerA call before the design is final

Bathroom projects near Rose District

Finished jobs a short drive from Main

No Rose District job is written up yet. These documented jobs in Glenpool and Tulsa show how we work: what each job covered, what we found once it was open, and the rounded price from its signed quote.

All projects
  • Curbless roll-in shower with large gray tile, a white hex floor and grab bars under a transom window, in a Glenpool home
    • Wheelchair Accessibility
    • Glenpool, OK

    A safe shower for a U.S. military veteran

    The Tinker Federal Credit Union Foundation asked us to build an accessible shower for a Korean War veteran in Glenpool, within a nonprofit budget. The corner jacuzzi tub came out, and a curbless roll-in shower with grab bars went in its place.

  • Freestanding soaking tub in a tiled wet room with a pebble floor and a white subway tile band, in a south Tulsa home
    • Bathroom Remodeling
    • Tulsa, OK

    A soaking tub inside the shower

    South Tulsa homeowners wanted a freestanding soaking tub without giving up the shower. We took out the old tub and shower floor and built a wet room: the tub and the shower share one tiled, waterproofed space with a pebble floor.

  • Tiled walk-in shower with a rain head and a hex-tile niche where a jacuzzi garden tub used to be, in a Tulsa master bathroom
    • Bathroom Remodeling
    • Tulsa, OK

    The garden tub became the shower

    An east Tulsa master bath with a jacuzzi garden tub, a separate older shower and an oak double vanity. We built a full tiled shower where the tub was, then updated the rest of the room around it, and the guest bath vanity too.

Accessible bathrooms, Rose District

Rose District questions, home and business

What does a bathroom remodel cost in the Rose District?

Taking a bathroom to the studs and rebuilding it typically costs $10,000 to $25,000; the smallest jobs we take start around $2,500 to $5,000. In a house built before 1960 the number moves with what is under the floor and behind the walls, so your quote lists those items on their own lines. For scale, a freestanding tub wet room we built in south Tulsa came to about $8,000 to $9,000. Business restrooms are priced after we measure.

Do you remodel upscale downtown Broken Arrow homes and lofts?

Yes. In a prewar house we choose tile and trim that suit its age; in a newer row home or loft we work to the finishes already there. Where a building has an HOA or a manager, we help get the approval before any work starts.

Do you offer financing for a Rose District bathroom remodel?

We do not finance remodels ourselves. To spread the cost, go to a local lender: Tulsa Teachers Credit Union, Arvest and Regent Bank all lend for remodels. Our itemized written quote is what they will ask to see.

Do you build accessible bathrooms for seniors in the Rose District?

Yes. Many houses near Main were built long before anyone planned a bathroom around a walker or a wheelchair, so the plan starts with the door width and the room to turn, then the shower: a low threshold or no curb, a seat, a hand shower on a slide bar, and blocking in the walls so grab bars hold. Wheelchair accessibility.

Can you add a low-threshold shower in a Rose District home?

Usually, yes. How depends on the floor: on a concrete slab we cut the shower area lower so the floor can fall to the drain, and on a wood-framed floor the framing under the shower is lowered or the rest of the floor is built up. We look at the slab or under the house on the first visit and tell you which applies before we price it.

Will an accessible remodel keep my home's modern look?

It should. A linear drain and large tile read as design, not as equipment. Grab bars can match the faucet finish, and a fold-down seat folds out of sight. A guest would not know the room was planned for the years ahead.

Can you bring a Main Street restaurant or shop restroom up to ADA standards?

Yes. We measure the door, the toilet corner, the sink and the sign against the 2010 ADA Standards, then give you an itemized list that separates quick fixes from work that moves a fixture or a wall. If a remodel of your dining room or sales floor is coming, tell us early, because by law it can bring the restroom into the job. ADA restroom compliance.

Will a restroom job close our shop on Main Street?

Not the shop. Restroom work takes 2 days to about a week on site, and we set the days with you before we start. If it is your only restroom, we agree on the closed days together so you can plan for staff and customers.

Rose District remodel, step by step

How a downtown job runs, start to finish

  • We come out from Tulsa to measure, free
  • Each line priced, in writing, in a day or two
  • Business restrooms: closed days set with you
  1. Step 1: Call or text, we answer

    Tell us what is going on with your bathroom. Someone picks up between 8 AM and 8 PM, and after hours our answering service takes the message.

    Someone picks up, 8 AM to 8 PM.

  2. Step 2: Free in-home estimate

    We look at the room, measure, and talk through what is possible and what we would not recommend, including how to future-proof the layout.

    We measure and talk through your options.

  3. Step 3: Written quote in 1 to 2 days

    You get an itemized quote that spells out the work and the materials, and says plainly what could change the price once the walls are open.

    An itemized quote, with what could change it.

  4. Step 4: Build, with every wet area waterproofed

    Work usually starts 1 to 2 weeks after you approve. Cement board and a waterproofing membrane go in every wet area, never sheetrock or green board. A full remodel runs about a week, up to two for intricate tile.

    About a week. Waterproofing in every wet area.

  5. Step 5: Walk-through and a written warranty

    We walk the finished bathroom with you and leave it clean. The workmanship carries a written 1-year warranty, with manufacturer warranties passed through to you.

    We walk it with you. Written 1-year warranty.

Free bath estimate, Rose District

Show us the room that isn't working

Phone, text or book a visit online, and we drive out to the house or the business, measure the room, check the door, the drain and the walls, and send a written quote in 1 to 2 days.

Rose District bathroom remodelers

Tell us about the room and the building

A house, a loft or a restroom on Main? A few lines are enough, and we usually reply the same day.

Call us(918) 300-4870
  • Free estimate with a written quote
  • We answer 8 AM to 8 PM
  • Locally owned in Tulsa

Fields marked with an asterisk are required.

A sentence or two about your project is plenty.

We respect your privacy and never sell your information. See our Privacy Policy and Terms.

Talk with a professional today