Master bathroom remodel in Tulsa, OK

The garden tub became the shower

An east Tulsa master bath with a jacuzzi garden tub, a separate older shower and an oak double vanity. We built a full tiled shower where the tub was, then updated the rest of the room around it, and the guest bath vanity too.

Service
Bathroom Remodeling
Location
Tulsa, OK
Completed
August 2025
Duration
About 5 weeks, contract to finished photos
Price range
$22,000 to $23,000
Tiled walk-in shower with a rain head and a hex-tile niche where a jacuzzi garden tub used to be, in a Tulsa master bathroom

4.931+ Google reviews

Master bathroom remodel ideas Tulsa

Drag to compare, tap a photo to see it whole

After: a tiled walk-in shower with a rain head, a hex-tile niche and a half wall beside a gray vanity, in the same Tulsa master bathroom
Before: a jetted garden tub under a window beside an oak vanity in a Tulsa master bathroom

Custom bathroom design in Tulsa

How we did it

After: a tiled walk-in shower with a rain head, a hex-tile niche and a half wall beside a gray vanity, in the same Tulsa master bathroom
More about bathroom remodeling

What was there

A master bathroom with a corner jacuzzi garden tub under the window, a separate older shower behind a framed glass door, and an oak double vanity with a cultured-marble top. The guest bath vanity matched it.

What we did

  • Took out the jacuzzi tub and the old shower, and hauled everything away.
  • Built a full tiled shower where the tub used to be: about 120 square feet of wall tile and 25 square feet of floor tile, with a shampoo niche.
  • Framed a new pony wall beside the shower, the half wall in the photos, and built a new closet with shelves.
  • Plumbing: a new shower valve and drain, the old shower's lines capped, and three vanity sinks set across the master and guest baths.
  • Electrical: power to the old jacuzzi cut off, a new exhaust fan, a new outlet and power for the pony wall, and a new vanity light.
  • Repaired the vinyl plank floor and floored the new closet.
  • Painted the walls, trim and cabinets in the master bath, and the guest bath cabinets.
  • Built twelve new vanity doors and five drawer fronts, raised the master vanity six inches, and added new mirror frames in both bathrooms.

The one change along the way

The homeowners picked a quartz slab for the vanity tops that cost more than the countertop allowance in the contract. We wrote it up as a change order before ordering it: $1,309 more, signed by them first. That is how every change works on our jobs: you see it and approve it in writing before we do it.

What it cost

About $22,000 to $23,000 for everything above, including the quartz upgrade. The fixtures were the homeowners' own choice, bought separately.

Contact Oklahoma Bath Professionals

Want a result like this? Let’s talk.

Serving the entire Tulsa metro. Reach out and a real person will get back to you.

Talk with a professional today